PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor interior metal framing outside Courtroom waiting area Facing North-East.jpg 2nd floor sprinkler heads Facing North.jpg Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg Erecting the stone panels at the East Elevation 4.jpg Installed pipe hangers at the 1st floor Facing West.jpg Interior metal framing at the 2nd floor Facing West.jpg Runing split wire above the ceiling at the 1st floor Facing North.jpg
Previous pageNext page Erecting the stone panels at the East Elevation 3
Erecting the stone panels at the East Elevation 3